Leap Forth

  • About
  • Business Intelligence
  • Accounting
  • Consulting
  • Learning
  • Contact
  • About
  • Business Intelligence
  • Accounting
  • Consulting
  • Learning
  • Contact

Consulting Engineering
>> Completed Projects
Engineers

Contact Us

Completed Projects

Partial list of our completed projects ...

Office Tower, Leboh Ampang, Kuala Lumpur
A 24-storey Office Tower

Wisma Kia Peng
28 storeys office tower and 24 storeys service apartment with 4 storeys podium and 4 levels carpark.
Total contract value: RM 200.0 Million

Putrajaya Parcel B
8 blocks of 8 storeys office buildings and a 3 storeys carpark block.
Total contract value: RM 200.0 Million.

Due Diligence Study for International Islamic University
A complete study of all existing Mechanical and Electrical Services in the campus.

Value Engineering for 1-Utama Extension 
Value Engineering for ACMV System to 1-Utama Extension for Bandar Utama.
Contract Value: RM 38.0 Million

Gallery DiRaja Selangor
Gallery Development at Klang for Selangor Royal Family.
Project Cost: RM 4.0 Million.

Galaxy Office Building, Petaling Jaya
1 Block 6 storey Office Development with 1 level basement at PJ, Selangor.
Project Cost: RM 9.0 Million.

Clustered House Development at KGSAAS, Zone B, Shah Alam
88 units of 3 storey clustered house dev with clubhouse at KGSAAS Shah Alam.
Project Cost: RM 18.5 Million.

Conservation of Bangunan Sultan Suleiman for 

Lembaga Muzium 
Conservation of existing 2 storey building and renovate to a gallery.
Project Cost: RM 3.5 Million.

Renovation of Muzium Sultan Alam Shah, Shah Alam
Renovation of Muzium Sultan Alam Shah at Shah Alam, Selangor.
Project Cost: RM 850,000.00

Housing Development at Bandar Tenggara, Johor
270 units of terrace, semi-D and banglo dev at Bandar Tenggara, Kota Tinggi.
Project Cost: RM 20.0 Million.

Housing Development at Kuala Selangor
130 units terrace housing development at Kuala Selangor.
Project Cost: RM 7.0 Million

Factory Extension for Dairen Chemical at Pasir Gudang, Johor
Extension of existing 6 storey chemical factory at Pasir gudang, Johor.
Project Cost: RM 5.5 Million

Shop Lots Development at Bandar Baru Bangi
60 units 2 storey Shop Lots development at Bandar Baru Bangi.
Project Cost: RM 4.0 Million.

Fit out work at Alamanda, Putrajaya for 

CPH Development Sdn Bhd
1 Lot of 2,500 sq ft developing of Sari Indah Nasi Padang Restaurant.

Double Storey Shop Lots at Bandar Sepang, Selangor
71 units of double storey shop lots at Bandar Sepang, Selangor Darul Ehsan.
Project Cost: 4.0 Million

Factory / Warehouse Development at Sungai Besi, KL
Single Storey Factory / warehouse development with 4 storey office at Sg Besi.
Project Cost: 4.8 Million.

Queensbay Mall at Bayan Lepas, Penang
Advisory role on shopping mall dev at Penanag for Tanigra Construction Sdn Bhd.

MALAYSIA MARINE SHIPYARD & ENGINEERING (MMSE)
Upgrade of HT Elec System for Malaysia Marine Shipyard & Eng at Pasir Gudang.

Commercial Development at Bandar Utama
2 storey commercial development at Bandar Utama for Johanjana Corporation Sdn Bhd.

Warehouse / Factory Development at West Port, Selangor
4950 sq.meter factory with a 2 storey office of 800 sq.meter at West Port.
Project Cost: RM 3 Million

Extension of Existing Low Yat Plaza
Proposed extension of Low Yat Plaza from Level 5 to Level 14.
Project Cost: Estimated RM 25 Million

Featured Project

Picture
Office Tower, Leboh Ampang, KL
24-storey office tower


Projects in Singapore


Picture
Picture
Theatres on the Bay
Esplanade Art Centre
State of the art theatre development.
Project Cost: S$ 300 Million.

Hyatt Regency Main Tower, Rehabilitation Phase I/II
Hotel Development incl. modification and upgrading of existing chilled water circuitry of air-conditioning system.
Project Cost S$ 81 Million.

Clark Quey Restoration & Redevelopment at River Valley Road/North Boat Quay
Dismantle, build & upgrading of 2 storey shop, restaurant & retail shops. 
Project Cost S$ 60 Million.

Amcol Hillview Condominium 
23 blocks of 10 storey residential building with a basement carpark.
Total project value S$ 30 Million

Hillview Villa
Comprising 2 storey and 3 storey terrace houses. 
Project Cost S$ 35 Million.

Asian Village at Sentosa Singapore 
Theme Park, Development area 77,600m2, Gross Floor Area 35,000m2 comprising various types of buildings found around South East Asia with amusement park rides.

Redevelopment to Cuppage Centre 
9 storeys of commercial building.
Project Cost: S$ 40 Million.

Pacific Plaza, Singapore 
Comprising of 3 basement carpark, 5 storeys shops and 7 storeys offices.
Project Value: S$40Million.

Picture
Powered by Create your own unique website with customizable templates.